Extended Aircon Installations

EXTENDED AIRCON INSTALLATION

Extended (more than 3 Meters)

MID-WALL SPLIT UNITS / SYSTEMS

A mid wall split unit has to be installed onto a wall. The name comes from the fact that half of the unit is mounted on the inside while the other half is mounted on the outside.

The unit and installation Includes:

The indoor portion or evaporator is mounted on the inside wall.

The condenser is mounted onto a set of brackets outside wherever the condenser needs to be extended to which can be:

  • Mounted on the same wall as the evaporator, more than three meters away from the evaporator.
  • Mounted on a different wall, more than 3 meters from the evaporator.
  • Mounted on the floor, more than 3 meters from the evaporator.

Water that will form from condensation will drain freely from the evaporator to outside.

Installation will take between 3 and 5 hours per unit.

We service the entire area of Gauteng and the surrounding areas.

The installation and equipment excludes:

If the evaporator cannot drain sufficiently and condensation starts building up, we will have to install a condensation pump at an extra fee.

All required materials longer than 3 meters will be charged separately and you will be charged per meter of extra material.

All electrical connections to the mains will have to be done by a qualified electrician which will be at your own expense.

This will also exclude installations outside of Gauteng.

Back to back extended (more than 5 meters)

CASSETTE SPLIT UNITS / SYSTEMS

Cassette split systems need to be installed into a ceiling. Again, half the unit will be mounted into the ceiling while the other half is mounted outside.

The unit and installation Includes:

The indoor portion or evaporator is mounted on the inside wall.

The condenser is mounted onto a set of brackets outside wherever the condenser needs to be extended to; more than 5 meters from the evaporator.

This type of system has a built in condensation pump which means it does not require a drain pipe to the outside of the building.

The installation will take between 4 and 6 hours per unit

We service the entire area of Gauteng (Johannesburg and Pretoria and the surrounding areas)

The unit and installation excludes:

Any materials that are required that are longer than 5 meters will be charged separately per meter.

All electrical connections to the mains will have to be done by a qualified electrician which will be at your own expense.